Case Study: DB Schenker Alexandria

By: | Tags: | Comments: 0

In December 2014 a 100kW solar system was installed at DB Schenker Alexandria.

This was the second project for DB Schenker and was a significant project in terms of the engineering required and complex materials handling  requirements – a crane being required for the panel lift.

“As a company, we had already had excellent service from Epho, when they developed and delivered a commercial solar system at our warehouse facility near Brisbane Airport. Nevertheless, we went through a competitive process again for a commercial solar system on our Australian Head Office in Sydney / Alexandria. Epho came out on top again, based on their professionalism, experience and focus on WHS. The Epho team took care of everything and installed our 100 kW system with minimal interruption to our on-going operation. They are just great at what they do and we can highly recommend Epho.”, GM NSW, Schenker Australia Pty Ltd.”

Ralf Mueller, General Manager, NSW

 

 

 

DB Schenker 2